Trixie 19763 Long Lead, 10 m/ø 5 mm
- Long line for dog training and control during off-leash exercise
- Leash made from durable, weather-resistant rope material
- Length: 10 m, Diameter: 5 mm
- From TRIXIE, specializing in dog leashes for various needs
Price History
1M 3M
Trixie 19763 Long Lead, 10 m/ø 5 mm
Price AlertPriceMachine Price
Popular Products
2 Offers
Sort by:
Best Match
Best Match
Price: Low to high
Price: High to low
Include Shipping
Trixie 19763 Set Line, 10 m/5 mm, Red B000WFFP7Q

£6.99
£11.48
Shipping: £4.49
with shipping: £4.49
Trixie Nylon 10m Tracking Leash for Dogs Command Training Sport Black or Red 19763

£7.99
£7.99
Shipping: Free
Shipping: Free
Product Details
| Long line for dog training and control during off-leash exercise |
| Leash made from durable, weather-resistant rope material |
| Length: 10 m, Diameter: 5 mm |
| From TRIXIE, specializing in dog leashes for various needs |
Price History
1M 3M
Trixie 19763 Long Lead, 10 m/ø 5 mm
Price AlertPriceMachine Price
Popular Products


















